ASH Logo - Orange

Fortress Grove

interior renovation

Client:

Fortress Grove

City:

Murfreesboro, TN

Process:

Project Scope:

Within two weeks, our team completed a full-scale interior renovation of multiple units, including:

  • Installed new carpet and vinyl flooring

  • Installed granite countertops in the kitchen and bath

  • Installed subway tile on the kitchen backsplash

  • Installed new cabinet doors, hardware, and drawer fronts

  • Installed new lighting throughout

  • Installed kitchen and bath faucets with new sinks

  • Installed a full bath hardware set (toilet paper holder, towel rod, shower curtain), plus a mirror with frame

  • Installed new blinds throughout

  • Installed new refrigerator, range, dishwasher, over-the-range microwave, washer, and dryer

  • Installed drywall and paint throughout

Our drywall and paint renovation includes filling nail holes, repairing water damage, patching and repairing cracks, and re-painting with high-quality, low-emission paint.

We renovated flooring throughout the unit, including replacing all carpet and vinyl flooring to make the space feel brand-new.

Our complete appliance set includes a refrigerator, kitchen range, in-sink disposal, dishwasher, over-the-range microwave, washer, and dryer.

Wow

Check out the transformation.

Transformations

Check out our other work.